Millenium Alvarado Apartments
6535 Alvarado Road, San Diego, California
Project Description
This project is a 5-story, 339-unit apartment building that wraps a 7-level parking structure.
Christian Wheeler provided all required Construction Phase Geotechnical Observation, Special Inspection, and Soil and Materials Testing.
Client
Din/Cal 4
Jurisdiction
City of San Diego
Services
Special Inspection and Materials Testing
Laboratory Testing
Christian Wheeler Engineering Team Leader
Shawn Caya, GE