Engineering and Interdisciplinary Sciences Complex
San Diego State University
Project Description
This project includes a new 90,0000 square-foot, two-wing, two- and three-story concrete building that includes a basement level, and a new steel frame bridge that connects the new complex to the existing Engineering Building. This project achieved LEED Gold status. Christian Wheeler Engineering provided all required Special Inspection and Materials Testing of Reinforced Concrete, Masonry, Spray-Applied Fireproofing, and Structural Steel Shop/Field Welding and Bolting of the structural steel.
Client: California Department of General Services
Jurisdiction: California Department of the State Architect (DSA)
Services: Special Inspection and Materials Testing
Christian Wheeler Engineering Team Leader: Charlie Carter, PE